All the frames have been cut. With the exception of the tops of 2, 4, and 6 which form the cabin top and motor well cover whose heights are yet to be determined. In this picture I drew where 2 and 4 might be cut.
The next step is to paint them thoroughly with epoxy to seal the wood. Two or three coats of epoxy will be required. I've arranged them around the various tables of my basement so that I'll be able to paint all seven at once. At least one side of all seven.
I'm concerned with how much garbage that working with epoxy generates. If I use a brush or roller there is no cleaning it and it simply becomes trash. My mixing bowls are paper soup bowls and wood stirring sticks, but those too become garbage. Thus I will attempt to paint all seven in a single go.

No comments:
Post a Comment