With all the major pieces prepped, I've leaned them off to the side. Then the remaining plywood was stored on a frame at the end of the shed, emptying the table.
The frames were brought up out of the basement workshop and placed in order against that plywood.
The next step is to modify the table frame into a cradle to hold the hull as it gets built. More on that when it happens.


No comments:
Post a Comment